Guanheng is specialized in steel structure engineering since 1987.
Description:
Single tube tower and communication rod are belong to the pipe tower technology, including the working platform for connecting the tower body and the upper parts of the tower body.It provides a maintenance door under the bottom of the tower. the working platform should be provided with a door-to-door hole, and the antenna support is fixed on the fence of the working platform. Those utilities are characterized in that the climbing ladders are composed with the inside and outside connector of the main body, the main climbing ladder rod is fixed connected with the supporting frame, and the supporting frame is coupled with the connecting bracket inside the wall of the tower body. Advantages: simple structure, reasonable; beautiful; easy installation and use, less land. The flat surface should be necessary.
Origin | China | Minimum Order | 1 Sets | |
Payment term | L/C, T/T | Shipment term: | FOB, C&F, CIF | |
Height | 10to 45 Meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer's request. | |||
Connection Mode | Socket connection or Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 13 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer's request | |||
Shipment Date | Quantity | Delivery Day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
Production Process
As a BV ,ISO ,SGS supplier in China ,we have more than 10years produce and export steel-pole experience, and we can assure the poles we offered are of sound quality which are made from qualified material by our professional workers and advanced equipment
.
1. Reply your inquiry in 24 working hours.
2. Experienced staffs answer all your questions in fluent English.
3. Customized design is available. UEM&UBM are welcomed.
4. Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
5. Special discount and protection of sales are provided to our distributor.
6. Professional factory : We are manufacturer, specializing in producing all kinds of steel poles for more than 20 years, competitive with good quantity.
7 Sample: We can send out sample for test in one week if the order quantity is big enough. But the shipment charges is usually paid by your side, the charges will be rebounded when we have formal order.
8. As an honest seller, we always use superior raw material, advanced machines, skilled technicians to ensure our products to be finished in high quality and stable feature. Welcome to contact us or visit our company.
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved