Guanheng is specialized in steel structure engineering since 1987.
Description:
Single tube tower and communication rod are belong to the pipe tower technology, including the working platform for connecting the tower body and the upper parts of the tower body.It provides a maintenance door under the bottom of the tower. the working platform should be provided with a door-to-door hole, and the antenna support is fixed on the fence of the working platform. Those utilities are characterized in that the climbing ladders are composed with the inside and outside connector of the main body, the main climbing ladder rod is fixed connected with the supporting frame, and the supporting frame is coupled with the connecting bracket inside the wall of the tower body. Advantages: simple structure, reasonable; beautiful; easy installation and use, less land. The flat surface should be necessary.
Origin | China | Minimum Order | 1 Sets | |
Payment term | L/C, T/T | Shipment term: | FOB, C&F, CIF | |
Height | 10to 45 Meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer's request. | |||
Connection Mode | Socket connection or Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 13 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer's request | |||
Shipment Date | Quantity | Delivery Day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
1, Can you do OEM for me?
We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price ASAP.
2, Can you do design for me?
We have experienced designers,According to your requirement,we can add your company logo, website, phone number or your ideas...on paper box .Just give me your ideas,let us do it for you.
3, When can I get the quotation?
We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation, please call us or tell us in your mail, so that we could regart your inquiry priority.
4, How about the delivery date?
For normal items delivery time is 35-45 days.
5, Which payment way is workable?
T/T , L/C at sight etc.
top and bottom of the pole is covered by mat or straw bale and the body surface is cloth or bubble coated paper wrapped or the packing can be as customer's request.
Delivery Self supporting tower
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved