Guanheng is specialized in steel structure engineering since 1987.
Description:
The seamless steel pipe is usually used as the main material of the three tube tower, which has low wind load coefficient and strong wind resistance. The main body adopts the outer flange connection, the bolt has been pulled, so it is difficult to destroy so that it can reduce the maintenance cost. The tower body has a positive triangle distribution, which accords with the physical law of triangle stability and saves steel materials,small area, reduce the cost of civil construction, convenient location. Light weight of tower, new trefoil cutting plate foundation, it reduces foundation cost. Truss structure design, convenient transportation and installation, short construction period. The tower with wind load curve design and smooth lines so it can avoid human and animal casualties. The design conforms to the national code for steel structure design and the design of tower mast structure Specification, this product is safety and reliability.scope of use: filed self-supporting tower, roof tower.
Origin | China | Minimum order | 1set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Height | 10 to 45meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer’s request. | |||
Connection Mode | Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 6 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer’s request | |||
Shipment Date | Quantity | Delivery day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
Main functions: lightning protection, equipped with ordinary lightning protection or high-grade professional products lightning protection device. Air-defense, equipped with ordinary barrier lights or advanced full-automatic long-life aeronautical barrier lights with flash.
Features: the stainless steel tower designed and made by our factory has beautiful appearance, corrosion resistance, good electrical and communication performance, excellent design and reasonable manufacture, and the tower body is equipped with channels for easy installation, repair and maintenance.
Decorative parts: special seamless steel tube and stainless steel ball for process tower structure, fully meet the requirements of GB/T14975 standard.
The corrosion resistance standard conforms to GB14975-94, and the design service life is 50 years. There are two pieces of water.
The design height of the tower body is 5-40 m, and the corresponding power beacon is used according to the height of the ground. 3. The seismic strength is 8 °, the wind resistance is over 30 m / s / s, and the thin ice resistance is 25 m ·s ~ (-1).
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved