Guanheng is specialized in steel structure engineering since 1987.
Description:
The seamless steel pipe is usually used as the main material of the three tube tower, which has low wind load coefficient and strong wind resistance. The main body adopts the outer flange connection, the bolt has been pulled, so it is difficult to destroy so that it can reduce the maintenance cost. The tower body has a positive triangle distribution, which accords with the physical law of triangle stability and saves steel materials,small area, reduce the cost of civil construction, convenient location. Light weight of tower, new trefoil cutting plate foundation, it reduces foundation cost. Truss structure design, convenient transportation and installation, short construction period. The tower with wind load curve design and smooth lines so it can avoid human and animal casualties. The design conforms to the national code for steel structure design and the design of tower mast structure Specification, this product is safety and reliability.scope of use: filed self-supporting tower, roof tower.
Origin | China | Minimum order | 1set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Height | 10 to 45meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer’s request. | |||
Connection Mode | Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 6 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer’s request | |||
Shipment Date | Quantity | Delivery day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
Product Description
Height | From 10 meter to 45 meter |
Suit for | Signal Transmission for Mobile Phone |
Shape | Polygonal or Conical |
Standard | ISO 9001:2008 |
Thickness | 1 mm to 36mm |
Specifications
1.Length of per section : Within 12 meter once forming
2.Tolerance of the dimension : According to client’s requirement.
3.Joint of Poles: Slip joint, flanged connected
4.Welding Standard: AWS (American Welding Society ) D 1.1
Detailed Images
Other Products
Our Company
The Jiangsu Xinjinlei Steel Industry Co., Ltd. is a joint venture company and was established in 2000, we got ISO 9001: 2008 quality management system certificate in 2001, our main products are transmission line steel pole, substation structure, telecommunication pole, street light pole, wind power pole etc.
Packing & Delivery
About us
FAQ
Q1. Are you trading company or manufacturer ?
A: We are factory.
Q2. What's your products' specifications?
A: Our steel poles can be produced according to your requirements, you can also tell me the height of the steel poles and the place of use, we can give you our advice.
Q3. What are your terms of payment?
A: 100% by TT. 30% deposit before fabricating, 70%balance before shipping. Other terms of payment may be negotiated.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. How about your freight?
A: Shanghai Seaport. For FOB, CFR or CIF price, please specify which exact model you need, and tell us your order quantity so that we can calculate the local transport charges and sea freight.
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved