Guanheng is specialized in steel structure engineering since 1987.
Description:
The materials of angle tower are mainly made of angle steel.According to the number of cross sections,there are triangle tower, for angle tower, pentagonal tower,hexagonal tower,octagonal tower,the most popular for communication tower are: triangle tower and four angle tower. The wind load coefficient of angle tower is small and wind resistance is stronger.The connection between angle steel and angle steel are by pieces.its character is bolt tension, hard to destroy and less cost for maintenance.Angle tower is square layout,the main characteristic is that assembling by angle steel, less processing and welding,scope of use: filed self-supporting tower, roof tower.
Origin | China | Minimum order | 1set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Height | 10 to 45meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer’s request. | |||
Connection Mode | Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 6 meters | |||
Wind Pressure | 0.35-1.00 KN/m² | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer’s request | |||
Shipment Date | Quantity | Delivery day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
1, Can you do OEM for me?
We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price ASAP.
2, Can you do design for me?
We have experienced designers,According to your requirement,we can add your company logo, website, phone number or your ideas...on paper box .Just give me your ideas,let us do it for you.
3, When can I get the quotation?
We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation, please call us or tell us in your mail, so that we could regart your inquiry priority.
4, How about the delivery date?
For normal items delivery time is 35-45 days.
5, Which payment way is workable?
T/T , L/C at sight etc.
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved