Guanheng is specialized on steel structure engineering since 1987.

GH  >  AI - Page Sitemap  >  GH stable antenna support pole suitable for building in the peak
GH stable antenna support pole suitable for building in the peak

GH stable antenna support pole suitable for building in the peak

MOQ
1 Sets
Payment Terms
L/C, T/T
Price Period
FOB, C&F, CIF
Tolerance
According to your request
Height
6 to 2 5Meters
Origin
China
Package
Pack in plastic paper or under customer’s request
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Comparison
GH Steel Structure provides diversified choices for customers. communications tower is available in a wide range of types and styles, in good quality and in reasonable price.Compared with products in the industry, GH Steel Structure's communications tower has the outstanding advantages which are mainly reflected in the following aspects.
Company Advantages
1. GH antenna support pole is fabricated under the standardized production environment.
2. A strict quality control system is to ensure the quality of the product.
3. This product quality is guaranteed, and has a number of international certification, such as ISO certification.
4. Foshan Nanhai Guanheng Steel Structure Co.,Ltd's sales department implements a perfect modern management system.


GH stable antenna support pole suitable for building in the peak-1


Description:
Roof support bar and roof rise frame are suitable for communication room with no advantage of its height than the surrounding building, and it needs the high strength structure for the building.The roof bracing pole is 15-20 meters high and the triangle is fixed on the  roof with reinforced concrete anti-beam. The whole structure is relatively simple and the weight is relatively light. Product advantages: suitable for building in the roof, peak and other areas, products are easy to move and quick installation.



Product Parameter


OriginChinaMinimum order1 set
Payment termL/C, T/TShipment termFOB, C&F, CIF
Height6 to 2 5Meters
MaterialQ345B/A572,Minimum yield strength >=345N/mm2;  Q235B/A36,Minimum yield strength >=235N/mm2;  According to your request
ToleranceAccording to your request
Surface testHot galvanization based on the standard of the steel technical specification on ASTM A123, or the customer' request.
Connection ModeFlange and socket connection
StandardISO 9001:2008, ISO14001:2005, OHSAS18001
Per Section LengthBelow 13 meters
Wind Pressure0.35-1.00 KN/m2
Hot-dip Galvanization thicknessPlating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm
Production ProcedureOriginal material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing
PackingPack in plastic paper or under customer' request
Shipment dateQuantityDelivery day
50 sets30 days



Product Details Comparison


Technology

GH stable antenna support pole suitable for building in the peak-2
Our Products
Each soldering seam is full,without solder slag,without solder skips,meet technical requirement.
VS
GH stable antenna support pole suitable for building in the peak-3
Other factory’s products
The other factory’s products have solder slag and solder skips,hidden danger.

Durable

GH stable antenna support pole suitable for building in the peak-4
Our Products
Zinc thickness is:99.7μm.
VS
GH stable antenna support pole suitable for building in the peak-5
Other factory’s products
If the zinc thickness is not enough, after some times, it will be rust,hidden danger.

We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.



Product Quality Standard


1. All the original materials and finished products should be 100% checking.

2. We already obtain the  ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.


GH stable antenna support pole suitable for building in the peak-6
GH stable antenna support pole suitable for building in the peak-7
GH stable antenna support pole suitable for building in the peak-8
GH stable antenna support pole suitable for building in the peak-9



Shipment


GH stable antenna support pole suitable for building in the peak-10
GH stable antenna support pole suitable for building in the peak-11

Split Charging Partial Packing Part Remark Loading Shipment



Customer Thank You Letter


GH stable antenna support pole suitable for building in the peak-12



Company Features
1. Based on several years market research, and with its rich R&D strength, Foshan Nanhai Guanheng Steel Structure Co.,Ltd has successfully developed antenna support pole in the field.
2. Foshan Nanhai Guanheng Steel Structure Co.,Ltd has technical personnel who are all highly educated.
3. We will achieve a balance between business profit and environment protection. Now, we have made significant progress in reducing waste pollution, including water and waste gas pollution. We respect environmental standards and strive to minimize the impact of our activities. We have energy reduction programs in place to minimize greenhouse gas emissions and have water recycling programs. For our company, sustainability is tightly intertwined with the work we do every day. We work in sustainability-oriented projects with groups spanning NGOs and charitable organizations. We will always follow corporate governance standards that promote integrity, transparency, and accountability in order to protect and enhance the long-term success of our company.
The design of GH antenna pole tower is completed by our thoughtful designers who keep the health&safety standards and environmental protection concepts in mind.
GH antenna support pole is manufactured in a short time. Each step in its manufacturing is generally performed by a separate footwear making machine.
Because of the high levels of heat produced by GH antenna pole tower, the aluminum PCB board that contains a thin layer of dielectric that allows quicker heat dissipation is attached to printed boards.
GH antenna support pole has to go through the life cycle assessment regarding its whole service life. The assessment includes its properties of chemical, physical, energy impacts.
GH antenna support pole is thoroughly tested to ensure that it must perform well in all weather conditions (snow, cold, wind) and withstand hundreds of pitch up and packing operations.
The product stands out for its stability. It features structural balance which involves the physical equilibrium, making it be able to withstand moment forces.
Product Message
Contact