Guanheng is specialized in steel structure engineering since 1987.
Description:
The seamless steel pipe is usually used as the main material of the four tubes tower, which has low wind load coefficient and strong wind resistance. The main body adopts the outer flange connection, the bolt has been pulled, so it is difficult to destroy so that it can reduce the maintenance cost. The tower body has a positive triangle distribution, which accords with the physical law of triangle stability and saves steel materials,small area, reduce the cost of civil construction, convenient location. Light weight of tower, new trefoil cutting plate foundation, it reduces foundation cost. Truss structure design, convenient transportation and installation, short construction period. The tower with wind load curve design and smooth lines so it can avoid human and animal casualties. The design conforms to the national code for steel structure design and the design of tower mast structure Specification, this product is safety and reliability.scope of use: filed self-supporting tower, roof tower.
Origin | China | Minimum order | 1set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Height | 10 to 45meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer’s request. | |||
Connection Mode | Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 6 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer’s request | |||
Shipment Date | Quantity | Delivery day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
window awning operator
Item No. | ZML2050, window awning operator |
Part name | window awning operator |
Material | zinc alloy |
Finish | powder coating |
Quality level | Middle to high class |
MOQ | 2000 pcs |
Delivery | 30 days |
Loading Port | Ningbo; Shanghai |
Payment terms | 30% deposit in advance, the balance should be paid before shipment |
Service | Sample & ODM/OEM |
color | white,gray,black customized |
Certificate | ISO 9001:2008 |
window awning operator
window awning operator
window awning operator
window awning operator
window awning operator
Window Components Mfg Miami Awning Operator
1. Packing: 1pcs window awning operator into polybag + inner box + master carton.
2. Delivery time: 30-40 days after order confirmed.
3. The quoted price is valid for 30 days due to the fluctuation of raw material cost.
4. Payment Terms: TT/LC at sight
5. Samples supply: we surely provived you samples required, sample charge is decided based on the requested q'ty and your cooperation, but freight cost paid from you withou dout.
6. Samples delivery: normally will be ready within 3 working days.
Please contact our After-sales service department in time within 30days after you received the cargo. | |
Tel: 0086-0574-8895-2586 Time: 9:00 a.m.- 6:00 p.m. (Beijing time) | |
Process | Please provide the copy of Sales Contract and describe the problems appeared. |
Problems confrimation: | |
Slight problem: | Please send the proof to our After-Sales Department, we will reply within two days. |
Serious problem: | |
A | We will dispatch our Quality and Problems Appraisers to make a confirmation. |
B | Have a negotiation of the compensation and sign agreements |
C | Our After-Sales Department will perform the duties as the agreements |
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved