Guanheng is specialized in steel structure engineering since 1987.
Description:
The seamless steel pipe is usually used as the main material of the four tubes tower, which has low wind load coefficient and strong wind resistance. The main body adopts the outer flange connection, the bolt has been pulled, so it is difficult to destroy so that it can reduce the maintenance cost. The tower body has a positive triangle distribution, which accords with the physical law of triangle stability and saves steel materials,small area, reduce the cost of civil construction, convenient location. Light weight of tower, new trefoil cutting plate foundation, it reduces foundation cost. Truss structure design, convenient transportation and installation, short construction period. The tower with wind load curve design and smooth lines so it can avoid human and animal casualties. The design conforms to the national code for steel structure design and the design of tower mast structure Specification, this product is safety and reliability.scope of use: filed self-supporting tower, roof tower.
Origin | China | Minimum order | 1set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Height | 10 to 45meter | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer’s request. | |||
Connection Mode | Flange connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 6 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer’s request | |||
Shipment Date | Quantity | Delivery day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
HIDEEP is a manufacturer with standard management process and standard control system, with the complete and integrated production line, from Molding workshop,die-casting workshop,machining workshop,polishing work,assembling workshop and so on, all spare parts and components are all made of HIDEEP factory.
Thank you very much for your interest in HIDEEP products. Here are some answers for the questions you may want to know.faucet,faucet
1. Can I get samples?
Yes, sample orders are always welcome and there is no MOQ request for a sample order or trial order.
2. What’s your MOQ?
100pcs for most items but for new client, less quantity is also welcome as trial order.
3. Can I order the products with my own brand?
Yes, we can laser print customer’s logo on the product with the permission and authorization letter from customers.
4. How is your factory production capability?
HIDEEP factory has a Full production line including Gravity Casting Line, Machining Line, Polishing Line and Assembling line.We can manufacture products up to 60000 pcs per month.
5. What’s your payment method and payment term?
Payment method: T/T, western union, online payment.
Payment terms: 30% deposit in advance, 70% balance before shipment for big order. It’s suggest 100% payment in advance for small order less than 1000USD in order to save bank charges
6. What’s your production time?
We have spare parts stocks for most items. 3-7days for sample or small orders, 15-35 days for a 20ft container.
7. How can I visit your factory or office?
Warmly welcome you visit our factory or office for business communication. Please try to contact our staff by email or mobile first. We will make the soonest appointment and arrangement for pick up. Thank you.
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved