Guanheng is specialized in steel structure engineering since 1987.

MOQ
1
Payment Terms
T/T,L/C
Price Period
15
Tolerance
+-0.5
Height
10-45m
Origin
Foshan
Package
wood or bag package
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Details
With a focus on quality, GH Steel Structure pays great attention to the details of steel structure.steel structure is in line with the stringent quality standards. The price is more favorable than other products in the industry and the cost performance is relatively high.
Company Advantages
1. GH is designed based on the innovative ideas of our designers. These ideas make sure that this product is able to go with the service flow of all kinds of stores.
2. has the advantages of , it may become the development trend in the field.
3. makes to be able to process tasks comprehensively and efficiently.
4. The product can increase the value of the house. Because of its unique design with high quality and functionality, it makes a huge difference when people plan to sell their property in the future.
5. People will be surprised at the longevity of this product. Even it is worn, washed, or dry cleaned many times, it still keeps the same high quality.


-1

Description:
The seamless steel pipe is usually used as the main material of the four tubes tower, which has low wind load coefficient and strong wind resistance. The main body adopts the outer flange connection, the bolt has been pulled, so it is difficult to destroy so that it can reduce the maintenance cost. The tower body has a positive triangle distribution, which accords with the physical law of triangle stability and saves steel materials,small area, reduce the cost of civil construction, convenient location. Light weight of tower, new trefoil cutting plate foundation, it reduces foundation cost. Truss structure design, convenient transportation and installation, short construction period. The tower with wind load curve design and smooth lines so it can avoid human and animal casualties. The design conforms to the national code for steel structure design and the design of tower mast structure Specification, this product is safety and reliability.scope of use: filed self-supporting tower, roof tower.



Product Parameter


OriginChinaMinimum order1set
Payment termL/C, T/TShipment termFOB, C&F, CIF
Height10 to 45meter
MaterialQ345B/A572,Minimum yield strength >=345N/mm2;  Q235B/A36,Minimum yield strength >=235N/mm2;  According to your request
ToleranceAccording to your request
Surface testHot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer’s request.
Connection ModeFlange connection
StandardISO 9001:2008, ISO14001:2005, OHSAS18001
Per Section LengthBelow 6 meters
Wind Pressure0.35-1.00 KN/m2
Hot-dip Galvanization thicknessPlating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm
Production ProcedureOriginal material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing
PackingPack in plastic paper or under customer’s request
Shipment DateQuantityDelivery day
50 sets30 days



Product Details Comparison


Technology

-2
Our Products
Each soldering seam is full,without solder slag,without solder skips,meet technical requirement.
VS
-3
Other factory’s products
The other factory’s products have solder slag and solder skips,hidden danger.

Durable

-4
Our Products
Zinc thickness is:99.7μm.
VS
-5
Other factory’s products
If the zinc thickness is not enough, after some times, it will be rust,hidden danger.

 We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.



Product Quality Standard


1. All the original materials and finished products should be 100% checking.

2. We already obtain the  ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.


-6
-7
-8
-9



Shipment


-10
-11
-12

Split Charging  Partial Packing  Part Remark  Loading  Shipment



Customer Thank You Letter




-13



Company Features
1. Foshan Nanhai Guanheng Steel Structure Co.,Ltd becomes the preferred choice for most of the Chinese customers. We specialize in the production of .
2. We have multi-disciplined teams. Their hands-on installation & manufacturing knowledge gives them a good understanding of what works in the real world. They help the company create products that meet real needs.
3. Through close cooperation at all times, GH Steel Structure has laid the foundation for successful cross-cultural cooperation. Please contact us! The goal of GH is to make great achievements in the industry of . Please contact us! Foshan Nanhai Guanheng Steel Structure Co.,Ltd aspires to be a competitive supplier. Please contact us!
Product procedure

 

HIDEEP is a manufacturer with standard management process and standard control system, with the complete and integrated production line, from Molding workshop,die-casting workshop,machining workshop,polishing work,assembling workshop and so on, all spare parts and components are all made of HIDEEP factory. 

FAQ

Thank you very much for your interest in HIDEEP products. Here are some answers for the questions you may want to know.faucet,faucet

1. Can I get samples?

   Yes, sample orders are always welcome and there is no MOQ request for a sample order or trial order.

2. What’s your MOQ?

   100pcs for most items but for new client, less quantity is also welcome as trial order.

3. Can I order the products with my own brand? 

   Yes, we can laser print customer’s logo on the product with the permission and authorization letter from customers.

4. How is your factory production capability? 
HIDEEP factory has a Full production line including Gravity Casting Line, Machining Line, Polishing Line and Assembling line.We can manufacture products up to 60000 pcs per month.

5. What’s your payment method and payment term?

   Payment method: T/T, western union, online payment.

   Payment terms: 30% deposit in advance, 70% balance before shipment for big order. It’s suggest 100% payment in advance for small order less than 1000USD in order to save bank charges

6. What’s your production time?

   We have spare parts stocks for most items. 3-7days for sample or small orders, 15-35 days for a 20ft container.

7. How can I visit your factory or office?

  Warmly welcome you visit our factory or office for business communication. Please try to contact our staff by email or mobile first. We will make the soonest appointment and arrangement for pick up. Thank you.

Combining the lean production method with innovation and thoughtful design, GH is exquisite in every detail. The number of fiber interface can be customized
Continuously improved management system makes sure the production process of GH runs smoothly and efficiently. The product is characterized by excellent stress-strain force performance
GH is made from imported raw materials with superior quality. It has gone through comprehensive inspection with traceable test data
Owing to our hard-working professional production team, GH is of the finest craftsmanship. The product has good repeated bending performance
GH is delicately manufactured and reflects a high level of technology. The outer sheath of the product is lead-free
Our quality management system ensures that our products meet international quality standards. Its external structure can prevent rodent damage
Product Message
Contact