Guanheng is specialized in steel structure engineering since 1987.
Description:
The integrated base station is one kind of fast integrated communication device, which consists of four parts: tower system, computer room system, antenna feeder system and steel frame support system. It is equipped with different communication equipment to meet the corresponding communication requirements.
Origin | China | Minimum order | 1 set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Heighten | 20 to 35 meters | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2;C30 precast concrete; According to your request,provide high strong standard | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123 , or the customer's request. | |||
Connection Mode | Flange and socket connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 6 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer's request | |||
Shipment date | Quantity | Delivery day | ||
30 sets | 30 days |
1.Integrated base station can be quickly built and put into use.Assembly is convenient and flexible, completely finished in three hours.
2.The tower body and the computer room are integrated, and the modular design is adopted. We reserve the position for the necessary equipment in order to meet the requirement of the standardization equipment for the communication operators.
3.The integrated base station structure adopts self-weight anti-over turning system, it does not need to excavate the foundation, so it can establish the station quickly and shorten the period.
4.A variety of modules are used in a wide range of locations with strong practicability for various external conditions.
5.It is convenient to carry with the crane and the ordinary flat plate car can, in order to deal with the rapid construction of station or emergency communication, this station can be strengthen the network, solve the customer’s problem of land acquisition,temporary network coverage or other problem in permanent base station.
The integrated base station structure adopts self-weight anti-over turning system, it does not need to excavate the foundation, so it can establish the station quickly and shorten the period.
Integrated base station can be quickly built and put into use.Assembly is convenient and flexible, completely finished in three hours.
A variety of modules are used in a wide range of locations with strong practicability for various external conditions
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved