Guanheng is specialized in steel structure engineering since 1987.
Description:
Roof support bar and roof rise frame are suitable for communication room with no advantage of its height than the surrounding building, and it needs the high strength structure for the building.The roof bracing pole is 15-20 meters high and the triangle is fixed on the roof with reinforced concrete anti-beam. The whole structure is relatively simple and the weight is relatively light. Product advantages: suitable for building in the roof, peak and other areas, products are easy to move and quick installation.
Origin | China | Minimum order | 1 set | |
Payment term | L/C, T/T | Shipment term | FOB, C&F, CIF | |
Height | 6 to 2 5Meters | |||
Material | Q345B/A572,Minimum yield strength >=345N/mm2; Q235B/A36,Minimum yield strength >=235N/mm2; According to your request | |||
Tolerance | According to your request | |||
Surface test | Hot galvanization based on the standard of the steel technical specification on ASTM A123, or the customer' request. | |||
Connection Mode | Flange and socket connection | |||
Standard | ISO 9001:2008, ISO14001:2005, OHSAS18001 | |||
Per Section Length | Below 13 meters | |||
Wind Pressure | 0.35-1.00 KN/m2 | |||
Hot-dip Galvanization thickness | Plating thickness less than 5mm, Zinc thickness more than 65μm, Plating thickness more than or equal 5mm, Zinc thickness more than86μm, tolerance less than 10μm | |||
Production Procedure | Original material test→cutting→bending→welding(fore-and-aft )→measurement checking→flange welding→making hole→making sample→surface clean→hot-galvanization and surface preparation→painting→re-check→packing | |||
Packing | Pack in plastic paper or under customer' request | |||
Shipment date | Quantity | Delivery day | ||
50 sets | 30 days |
Technology
Durable
★ We are very strictly in controlling the thickness of all the parts in hot-dip galvanization,all those parts stay with corrosion for years.If the process of hot dip galvanization is not good, it is easy to be rusted and affect the safety of the tower.
1. All the original materials and finished products should be 100% checking.
2. We already obtain the ISO 9001:2008, ISO14001:2005 and OHSAS18001 quality and safety certificate.
Split Charging → Partial Packing → Part Remark → Loading → Shipment
Copyright © 2018 Foshan nanhai guanheng steel structure co. LTD. | All Rights Reserved